Rolling Resistance Calculator for Haul Roads & Mining Roads

CLAYCRETE II™ / HAUL ROAD PLANNING

Calculate Savings

What could a stronger mining road mean for your operation? Select your haul truck, compare road strength, and enter your haul cycle to estimate the change in rolling-resistance energy cost.

9 equipment presets Loaded + return journeys Editable site assumptions
01

Your equipment & operation

Selecting equipment loads its mass, wheel load, and tire contact radius from the workbook.

02

Compare road strength

CBR values may exceed 100. Use measured existing strength and a site-specific target.

03

Your haul cycle

Currency labels your entered diesel price. No exchange-rate conversion is applied.

YOUR ESTIMATED OPPORTUNITY

Loaded + empty return • annual fleet estimate

Annual modeled saving

—

Rolling-resistance energy cost only

Saving per cycle —
Modeled cost reduction —
Annual fuel equivalent saved —
Fleet cycles per year —

Annual modeled cost comparison

Existing road —
Improved road —

Planning estimate based on the supplied workbook. This is not a total fuel bill or a guaranteed saving. Treatment and implementation costs are excluded.

LOOK UNDER THE HOOD

The detail, when you need it.

Review or customize the assumptions without crowding the main calculator.

Advanced assumptions & equipment settings

Defaults reproduce the spreadsheet. Selecting a truck resets its mass, wheel load, contact radius, and empty-load factors; it keeps your road and fleet inputs.

Road model

The workbook saves k = 15 for both scenarios. A workbook note mentions k = 20 for Claycrete-treated soils; change it only when appropriate for your site.

Selected equipment

Empty return assumptions

The workbook assumes the empty contact radius and beta equal the loaded values. Here you can override either. The two empty-load factors default to 0.42.

Detailed calculation breakdown

Results below use the most recently calculated inputs.

Loaded and empty-leg comparison
Metric Loaded existing Loaded improved Return existing Return improved Units
Fleet cost and saving reconciliation
Metric Existing Improved / saving
Formulas, source notes & model limitations

How the calculation works

  1. Modulus: E (MPa) = CBR × k; E (Pa) = E (MPa) × 1,000,000.
  2. Deflection: δ = wheel load ÷ (π × contact radius × E in Pa).
  3. Rolling resistance: RR = α × δ + β. Multiply by 100 to show a percentage.
  4. Tractive force: F = RR × vehicle mass × gravity.
  5. Journey energy: MJ = F × journey distance ÷ 1,000,000.
  6. Fuel equivalent: liters = MJ ÷ diesel energy density. Journey cost = liters × diesel price.
  7. Calculate loaded and empty journeys separately. Empty mass and wheel load use their respective factors.
  8. Annual cycles = cycles per truck per day × fleet size × operating days.
  9. Annual saving = (existing cycle cost − improved cycle cost) × annual cycles.

What this estimate includes

Only the modeled energy cost attributed to rolling resistance on the selected journey segments. Both road scenarios use the same operating schedule, fuel price, and truck settings. Each daily cycle includes one loaded trip and, when selected, one empty return.

What it does not include

Engine or drivetrain efficiency, gradient, aerodynamic drag, acceleration, idling, auxiliaries, speed or cycle-time changes. The spreadsheet divides mechanical energy directly by diesel energy content; its liters are therefore fuel-energy equivalents, not a prediction of actual fuel consumption. No efficiency multiplier has been added.

Water spraying, tire wear, maintenance, productivity, emissions, treatment cost, payback, and net return on investment are not quantified by the source formulas and are excluded. The workbook’s narrative tire-saving range is not added to the result.

Workbook audit decisions

  • All three visible sheets—Calculator, README, and Haul Truck Library—and the hidden Formula_Audit sheet were reviewed.
  • The headline uses the complete cycle (Calculator rows 104–121), rather than the earlier loaded-only headline cards.
  • All nine truck presets are copied from the supplied library. These are workbook reference values, not independently verified manufacturer specifications.
  • CBR is not capped at 100: the workbook itself uses an improved CBR of 200, despite its conflicting validation rule.
  • Tire size and pressure are reference information; they do not independently feed the formulas. Contact radius is not recalculated from pressure.
  • Negative savings remain visible as a modeled cost increase. Zero trips, distance, or fuel price correctly produce zero applicable costs.
  • The saved source uses k = 15 for the improved scenario, despite a note mentioning 20 for treated soil. The calculator preserves 15.
  • The source print area ends at row 76, so the return-leg and complete-cycle sections below it can be missed in a printed copy.

Source: Rolling Resistance Reduction - Cost Savings Version 1.01.xlsx. This calculator reproduces its empirical model; site calibration and review are needed before using estimates in a business case. Source workbook copyright notice retained: © 18 June 2026.

Workbook field map & verification

Input-to-cell trace

Calculator input Source cell / range Saved default
Truck selection Calculator!H12 Caterpillar 797F
Existing / improved CBR Calculator!C15 / I15 50 / 200
Existing / improved k Calculator!C16 / I16 15 / 15
Wheel load / contact radius / mass Calculator!C28 / C29 / C32 Truck-library lookup
Alpha / beta Calculator!C30 / C31 80 / 0.01
Gravity Calculator!C33 9.81 m/s²
Loaded distance Calculator!C34 5,000 m
Diesel energy / price Calculator!C35 / C36 38.6 MJ/L / AUD 1.80 per L
Cycles / trucks / days Calculator!C37:C39 12 / 10 / 365
Empty mass / wheel-load factors Calculator!C79 / C80 0.42 / 0.42
Return distance / radius / beta Calculator!C81 / C84 / C85 Linked to loaded values
Equipment presets Haul Truck Library!A4:L12 Nine models

Default-result reconciliation

Workbook result Source cell AUD
Loaded annual saving H48 4,101,365.09
Empty-return annual saving D101 723,480.80
Complete-cycle existing annual cost C110 7,410,462.75
Complete-cycle improved annual cost D110 2,585,616.86
Complete-cycle annual saving D111 4,824,845.89

The implementation was checked against ten saved workbook results to within AUD 0.000001 or equivalent numeric precision, with all nine presets checked for loaded-plus-return reconciliation. Additional checks cover loaded-only mode, unchanged road strength, negative savings, zero activity, fleet scaling, and invalid inputs.

Interpretation decisions

The README describes editable highlighted cells, truck lookups, and the return-leg extension. Formula_Audit confirms the same energy chain as Calculator. Neither provides an independent physical calibration or a machine-efficiency model. The final workbook note links road roughness to k, but supplies no numerical roughness-to-k function, so no roughness slider or automatic k adjustment is invented.

The source contains no formulas for monetary tire, water, maintenance, or productivity benefits. Those are not added as presumed savings. Client name, prepared-by, and issue-date fields are presentation metadata rather than savings drivers and are omitted from the main view.

The fleet uses one selected model at a time. A mixed fleet should be calculated separately for each model and its actual truck count; annual savings can then be added without counting the same trucks twice.