Rolling Resistance Calculator for Haul Roads & Mining Roads
Calculate Savings
What could a stronger mining road mean for your operation? Select your haul truck, compare road strength, and enter your haul cycle to estimate the change in rolling-resistance energy cost.
Loaded + empty return • annual fleet estimate
Annual modeled saving
Rolling-resistance energy cost only
Annual modeled cost comparison
Planning estimate based on the supplied workbook. This is not a total fuel bill or a guaranteed saving. Treatment and implementation costs are excluded.
The detail, when you need it.
Review or customize the assumptions without crowding the main calculator.
Advanced assumptions & equipment settings
Defaults reproduce the spreadsheet. Selecting a truck resets its mass, wheel load, contact radius, and empty-load factors; it keeps your road and fleet inputs.
Road model
The workbook saves k = 15 for both scenarios. A workbook note mentions k = 20 for Claycrete-treated soils; change it only when appropriate for your site.
Selected equipment
Empty return assumptions
The workbook assumes the empty contact radius and beta equal the loaded values. Here you can override either. The two empty-load factors default to 0.42.
Detailed calculation breakdown
Results below use the most recently calculated inputs.
| Metric | Loaded existing | Loaded improved | Return existing | Return improved | Units |
|---|
| Metric | Existing | Improved / saving |
|---|
Formulas, source notes & model limitations
How the calculation works
- Modulus: E (MPa) = CBR × k; E (Pa) = E (MPa) × 1,000,000.
- Deflection: δ = wheel load ÷ (π × contact radius × E in Pa).
- Rolling resistance: RR = α × δ + β. Multiply by 100 to show a percentage.
- Tractive force: F = RR × vehicle mass × gravity.
- Journey energy: MJ = F × journey distance ÷ 1,000,000.
- Fuel equivalent: liters = MJ ÷ diesel energy density. Journey cost = liters × diesel price.
- Calculate loaded and empty journeys separately. Empty mass and wheel load use their respective factors.
- Annual cycles = cycles per truck per day × fleet size × operating days.
- Annual saving = (existing cycle cost − improved cycle cost) × annual cycles.
What this estimate includes
Only the modeled energy cost attributed to rolling resistance on the selected journey segments. Both road scenarios use the same operating schedule, fuel price, and truck settings. Each daily cycle includes one loaded trip and, when selected, one empty return.
What it does not include
Engine or drivetrain efficiency, gradient, aerodynamic drag, acceleration, idling, auxiliaries, speed or cycle-time changes. The spreadsheet divides mechanical energy directly by diesel energy content; its liters are therefore fuel-energy equivalents, not a prediction of actual fuel consumption. No efficiency multiplier has been added.
Water spraying, tire wear, maintenance, productivity, emissions, treatment cost, payback, and net return on investment are not quantified by the source formulas and are excluded. The workbook’s narrative tire-saving range is not added to the result.
Workbook audit decisions
- All three visible sheets—Calculator, README, and Haul Truck Library—and the hidden Formula_Audit sheet were reviewed.
- The headline uses the complete cycle (Calculator rows 104–121), rather than the earlier loaded-only headline cards.
- All nine truck presets are copied from the supplied library. These are workbook reference values, not independently verified manufacturer specifications.
- CBR is not capped at 100: the workbook itself uses an improved CBR of 200, despite its conflicting validation rule.
- Tire size and pressure are reference information; they do not independently feed the formulas. Contact radius is not recalculated from pressure.
- Negative savings remain visible as a modeled cost increase. Zero trips, distance, or fuel price correctly produce zero applicable costs.
- The saved source uses k = 15 for the improved scenario, despite a note mentioning 20 for treated soil. The calculator preserves 15.
- The source print area ends at row 76, so the return-leg and complete-cycle sections below it can be missed in a printed copy.
Source: Rolling Resistance Reduction - Cost Savings Version 1.01.xlsx. This calculator reproduces its empirical model; site calibration and review are needed before using estimates in a business case. Source workbook copyright notice retained: © 18 June 2026.
Workbook field map & verification
Input-to-cell trace
| Calculator input | Source cell / range | Saved default |
|---|---|---|
| Truck selection | Calculator!H12 | Caterpillar 797F |
| Existing / improved CBR | Calculator!C15 / I15 | 50 / 200 |
| Existing / improved k | Calculator!C16 / I16 | 15 / 15 |
| Wheel load / contact radius / mass | Calculator!C28 / C29 / C32 | Truck-library lookup |
| Alpha / beta | Calculator!C30 / C31 | 80 / 0.01 |
| Gravity | Calculator!C33 | 9.81 m/s² |
| Loaded distance | Calculator!C34 | 5,000 m |
| Diesel energy / price | Calculator!C35 / C36 | 38.6 MJ/L / AUD 1.80 per L |
| Cycles / trucks / days | Calculator!C37:C39 | 12 / 10 / 365 |
| Empty mass / wheel-load factors | Calculator!C79 / C80 | 0.42 / 0.42 |
| Return distance / radius / beta | Calculator!C81 / C84 / C85 | Linked to loaded values |
| Equipment presets | Haul Truck Library!A4:L12 | Nine models |
Default-result reconciliation
| Workbook result | Source cell | AUD |
|---|---|---|
| Loaded annual saving | H48 | 4,101,365.09 |
| Empty-return annual saving | D101 | 723,480.80 |
| Complete-cycle existing annual cost | C110 | 7,410,462.75 |
| Complete-cycle improved annual cost | D110 | 2,585,616.86 |
| Complete-cycle annual saving | D111 | 4,824,845.89 |
The implementation was checked against ten saved workbook results to within AUD 0.000001 or equivalent numeric precision, with all nine presets checked for loaded-plus-return reconciliation. Additional checks cover loaded-only mode, unchanged road strength, negative savings, zero activity, fleet scaling, and invalid inputs.
Interpretation decisions
The README describes editable highlighted cells, truck lookups, and the return-leg extension. Formula_Audit confirms the same energy chain as Calculator. Neither provides an independent physical calibration or a machine-efficiency model. The final workbook note links road roughness to k, but supplies no numerical roughness-to-k function, so no roughness slider or automatic k adjustment is invented.
The source contains no formulas for monetary tire, water, maintenance, or productivity benefits. Those are not added as presumed savings. Client name, prepared-by, and issue-date fields are presentation metadata rather than savings drivers and are omitted from the main view.
The fleet uses one selected model at a time. A mixed fleet should be calculated separately for each model and its actual truck count; annual savings can then be added without counting the same trucks twice.