Full Depth Reclamation

To maintain and rehabilitate aging roads and parking infrastructure can be a challenge. Claycrete II™ combines with the existing failed pavement, including the underlying base, to preserve your initial road investment.

Ripper.jpg
reclaimer-step-1.png

This process of Full Depth Reclamation, FDR, reduces the need to haul out used materials and haul in expensive new materials. When using Claycrete II™ there is a minimal impact on local business and residents because of the shortened construction period - the road can be used immediately after compaction, and no drying or setting time is required.

Consider Claycrete II™ FDR if your roads are experiencing asphalt failure with patches in excess of 20% or chip seal failures due to a weak sub base. It is cost effective as it preserves the initial road investment as a low cost chemical soil stabilizer using reclaimed materials.

Reclamation projects using Claycrete II™ have experienced the following benefits, among others: Claycrete II™ increases durability of roads, even where the base thickness and new surface course layers are decreased, as well as decreasing pavement permeability to water. Claycrete II™ leaves a reduced carbon footprint, and is certified as safe, posing zero harm to the environment and personnel.

Grader Heavy  - Claycrete Global.jpg